If your White Rock home was built between 1978 and 1995, the grey pipe behind the drywall is very likely Poly B. We replace it in PEX-A and hand you the paperwork your insurer asks for.
Poly B is the grey plastic supply pipe stamped PB2110 that went into Canadian homes from 1978 until roughly 1995. It was designed for about 25 years of service, which means every system still in the ground in White Rock is past it.
The low-rise condo stock is where we find most of White Rock’s Poly B — a lot of it went up through the eighties and nineties.
It fails from the inside out — chlorine in the municipal supply makes the pipe wall brittle, and the original grey acetal fittings are the weakest point in the whole system. Nothing about that is visible until water appears somewhere it should not.
We replace the lot in PEX-A, plan the routes first so we open as few walls as possible, and finish with the permit, the inspection record and photographs.
East Beach · West Beach · Five Corners · Hillside — and everywhere else in White Rock.
Permitted work in White Rock goes through the City of White Rock. We pull it and book the inspection as part of the job — you do not deal with the city.
The full rundown: why Poly B fails, what replacement involves, how long it takes and what it costs.
How Poly B replacement works →White Rock has an older detached stock alongside a large number of low-rise condos built through the 1980s and 90s — and those condos are a common place to find Poly B.
The whole town runs down a slope to the beach, so supply and drainage both work with a lot of elevation change.
We will confirm whether it is Poly B, what condition it is in, and what replacement would cost in White Rock. No charge.